Talk Through Your Site Plan With an Engineer
Site design · Stormwater · Permitting

Civil plans drawn to clear review the first time.

Resubmittals cost your project months. We draw your site design, stormwater and permitting package in Salt Lake City to arrive complete on the first submittal.

Founded by two former municipal engineers who sat on the reviewer's side of the counter.

Engineers answer the phone Mon-Fri 8am-5pm

Stamped grading and drainage plan with reviewer redlines beside a clean copy on a drafting desk, showing Meridian’s first‑time‑approval focus
Site Design Stormwater Permitting
The cost of a resubmittal

Every redline sends your project back into the review queue.

You submit. Comments come back. The sheets get revised, resubmitted and reviewed again. Each pass through that cycle is time your project is not moving.

Most of those cycles start the same way: civil plans that arrive incomplete. The reviewer cannot approve what is not on the sheet, so the set goes back to you. That is how a permit you expected in weeks turns into months.

Meridian Civil Engineering draws your plan set to clear review on the first submittal. That is the goal the work is built around.

See what goes into a first-time-approval plan set
ResubmittalCost to you
Months on the calendar
Each comment cycle means revising, resubmitting and waiting for review again. Incomplete plans can repeat that loop more than once.
Carrying costs that keep running
Your land, your financing and your holding costs do not pause while sheets are redrawn. Every extra cycle is paid for out of your project.
A schedule you cannot answer for
When your lender or partners ask when the permit will land, a pending resubmittal leaves you guessing instead of giving them a date.
Your attention, off the deal
Time spent chasing review comments is time not spent on the deal and the build.
Two former municipal engineers reviewing a printed grading and drainage sheet with red‑pen comments, highlighting Meridian’s reviewer insight
Why we know what reviewers want

We started on the reviewer's side of the counter.

Both founders of Meridian Civil Engineering began their careers as municipal engineers. Our job was reading civil plan sets and sending back the ones that were not ready. Most came back missing the same things, over and over.

We watched developers lose months to resubmittals that never had to happen. So we opened Meridian in Salt Lake City to draw your site, stormwater and permitting packages the way we always wished they had arrived on our desks: complete, the first time.

Where we started
Municipal engineering, reviewing civil plan sets
What we saw
Plan sets returned for the same gaps, cycle after cycle
What it cost
Months of review cycles and carrying costs for the developer
What we draw now
Your plan set, built around first-time approval as the goal

First-time approval is the target every sheet is drawn toward. It is not a guarantee. It is how we read a plan set before the reviewer does.

Services

The three pieces that most often stall your approval

Site design, stormwater and permitting are where review comments pile up. We draw each one around what the reviewer needs to see, so your submittal answers the questions before they are asked.

Civil engineer examines a dimensioned commercial site plan with parking layout on a drafting table, illustrating Meridian’s precise site design
Site design

A site plan the reviewer can follow

The site plan is the map of your project: where the building, parking and access sit on the lot.

In your plan set

  • Site layout with building footprint, parking, drive aisles and access points, dimensioned.
  • Grading and drainage plan, the finished ground elevations that show where water goes.

What the reviewer checks

  • Zoning compliance: setbacks, layout and parking against the code.
  • Access and right-of-way, the public strip along the street.
  • Grades that drain away from buildings and neighbouring lots.
Concrete stormwater detention basin with outlet structure at a new Salt Lake City development, showing Meridian’s drainage engineering
Stormwater

Runoff handled on paper before it is handled on site

Stormwater management is how your site handles rain and snowmelt once the ground is paved.

In your plan set

  • Stormwater design for detention basins, inlets and swales.
  • Calculations behind every basin and pipe on the drawings.
  • Erosion control plan, how soil stays on site during construction.

What the reviewer checks

  • Runoff after development is managed to the local standard.
  • The calculations match what is drawn.
  • Erosion control is in place before ground breaks.
Bound civil engineering plan set beside a permit submittal checklist on an office desk, emphasizing Meridian’s ready‑to‑submit packages
Permitting

A submittal that arrives complete

Permitting is the submittal itself: the package that goes across the counter and through review.

In your plan set

  • A complete package assembled to the reviewing jurisdiction's requirements.
  • Coordinated sheets: site, grading and stormwater tell one story.
  • Written responses if comments come back, tied to the sheet that changed.

What the reviewer checks

  • Nothing required is missing from the package.
  • The sheets agree with each other.
  • Every comment has an answer.

Tell us where your project stands. An engineer will walk through what your plan set needs.

How a project moves

Four steps from your site to an approved plan set

Each step is built around one question: what will the reviewer need to see? Answer it before submittal, and the review cycle has less to send back.

  1. Intake

    You tell us where the site is, which municipality reviews it and what stage your project is at. That sets the code, the review standards and the scope before a line is drawn.

    What you getA clear scope for your site design, stormwater and permitting work.

  2. Design

    We draw your site plan, grading and drainage (how the ground is shaped so water leaves the site where it should) and stormwater management. Each sheet is drawn the way a reviewer reads it.

    What you getCivil drawings built for your jurisdiction's review, not a generic template.

  3. Submittal-ready package

    The plan set is checked as a whole before it goes in. Missing items are what trigger resubmittals. We look for them from the reviewer's side of the counter, where we both started.

    What you getA complete permitting package, ready for the first submittal.

  4. Approval

    The set goes to review. First-time approval is the goal every earlier step is built around. It is not a guarantee. It is how the drawings are made.

    What you getA schedule you can give your lender and partners with confidence.

Have a site in the Salt Lake City area and a review date you need to hit? Start with step one.

What developers tell us

Plan sets that clear review faster than anyone they have used

Developers say Meridian's plan sets clear review faster than any firm they have used.

That is the feedback we hear most, and it is the one we work for. A set that arrives complete gets read once, not argued over across comment cycles. Here is what that changes for your project.

You submit without bracing for redlines

The set goes in drawn the way a Salt Lake City area reviewer reads it.

You can answer your lender

When partners ask when the permit will land, you have a real answer instead of a guess.

You get back to the deal and the build

Less time chasing resubmittals. Fewer months of carrying costs.

First-time approval is the goal every set is built around. It is not a guarantee, and we will not call it one.

Developer and engineer review an approved civil site plan set at a drafting table in a Salt Lake City office, reflecting Meridian’s fast approvals
A complete plan set, reviewed across the table before it goes to the city.
Next step

Talk through your site plan with an engineer

Tell us where your site is, which municipality reviews it and where your project stands. You talk with an engineer who has read civil plan sets from the reviewer's side of the counter. The conversation is about what your submittal needs before it goes in, not after it comes back redlined.

Send your project details

Site location, reviewing municipality and project stage are the three things an engineer needs to start the conversation.

If you already have review comments on a submittal, mention them here.

Talk to an engineer Call us