Talk Through Your Site Plan With an Engineer
Services

Site design, stormwater and permitting, drawn for the reviewer.

These are the three pieces that most often stall your approval in the Salt Lake City area. We draw each one so your plan set answers the reviewer's questions before they are asked.

For developers and municipalities. Founded by two former municipal engineers who reviewed civil plan sets before they drew them.

What goes into your plan set

Three services, one complete submittal

Each service is framed around the review outcome: what the reviewer needs to see, and how your sheets show it.

Meridian engineer annotating a commercial site plan with parking and drive aisles on a table.
Site design

A site plan the reviewer can follow

Your site plan is the map of your project: where the building, parking and access sit on the lot. We draw it so zoning compliance can be checked at a glance.

  • Site layout, with building footprint, parking, drive aisles and access points dimensioned.
  • Grading and drainage plan, the finished ground elevations that show where water goes.
  • Zoning compliance shown on the sheet: setbacks, layout and parking against the code.
  • Access and right-of-way, the public strip along the street, drawn clearly.
Talk to an engineer
Graded stormwater detention basin with concrete outlet at a new commercial site in Salt Lake Valley.
Stormwater

Runoff handled on paper first

Stormwater management is how your site handles rain and snowmelt once the ground is paved. The reviewer checks that your calculations match what is drawn.

  • Stormwater design for detention basins, inlets and swales.
  • Calculations behind every basin and pipe on the drawings.
  • Erosion control plan, how soil stays on site during construction.
  • Post-development runoff managed to the local standard.
Talk to an engineer
Bound civil engineering drawings and permit application stacked on a municipal review counter.
Permitting

A submittal that arrives complete

Permitting is the package that goes across the counter and through review. Missing items trigger resubmittals, so we check the set as a whole before it goes in.

  • A complete package assembled to your reviewing jurisdiction's requirements.
  • Coordinated sheets: site, grading and stormwater tell one story.
  • Written responses if comments come back, tied to the sheet that changed.
Talk to an engineer
How a project moves

From your site to an approved plan set

First-time approval is the goal every step is built around. It is not a guarantee, and we will not call it one.

  1. Intake

    You tell us where the site is, which municipality reviews it and what stage your project is at. That sets the code and the scope.

  2. Design

    We draw your site plan, grading and drainage and stormwater management. Each sheet is drawn the way a reviewer reads it.

  3. Submittal-ready package

    The plan set is checked as a whole for missing items, from the reviewer's side of the counter, before it goes in.

  4. Approval

    The set goes to review, drawn to clear on the first submittal so your schedule is not left to comment cycles.

Tell us where your project stands

An engineer will walk through what your plan set needs before it goes to the city.

Talk Through Your Site Plan With an Engineer
Talk to an engineer Call us